Project: “Krumovo – Parvomai, km 164+575.00 – km 202+300.00” from the first railway line on the object “Electrification and reconstruction of the railway line Plovdiv – Svilengrad, corridors IV and IX”
Design phase: Definitive design
Employer: TERNA
Contractor company (Consultant): Vector-Bul Ltd. – subcontractor
Excerpt from the reference: Vector-Bul company successfully designs the railway track, stations and stops, longitudinal drainage, drains, subways, prokary, retaining walls, as well as several major facilities such as railway bridges, overpasses and their road connections with the Republican infrastructure.
Total project construction value: 85 728 832 EURO.
Design Value: over 2 000 000 BGN.
Deadline: 2006 year – 2010 year
Project Status (Completed, Approved): Approved, completed and completed construction with Act 16.