Reconstruction and electrification of the Plovdiv – Svilengrad – Turkish border / Greek border railway line and optimization of the 160 km/h (200 km/h) route – 2009.

Project: Reconstruction and electrification of the Plovdiv - Svilengrad - Turkish border / Greek border railway line and optimization of the 160 km/h (200 km/h) route. Design phase: Definitive design Employer: OHL ZS a.s. Contractor company (Consultant): Vector-Bul Ltd. Excerpt from the reference: Vector-Bul Ltd. has a team of qualified

Go to Top