{"id":12671,"date":"2019-10-14T00:00:16","date_gmt":"2019-10-13T21:00:16","guid":{"rendered":"https:\/\/www.vector-bul.com\/?page_id=12671"},"modified":"2026-03-02T10:22:54","modified_gmt":"2026-03-02T08:22:54","slug":"about-us","status":"publish","type":"page","link":"https:\/\/www.vector-bul.com\/en\/about-us\/","title":{"rendered":"ABOUT US"},"content":{"rendered":"<p><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-margin-bottom:20px;--awb-background-color:#ffffff;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_2 1_2 fusion-one-half fusion-column-first\" style=\"--awb-bg-size:cover;--awb-margin-bottom:0px;width:50%;width:calc(50% - ( ( 4% ) * 0.5 ) );margin-right: 4%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"fusion-text fusion-text-1\"><p><strong>Vector-Bul Ltd.<\/strong> was established in 2002 based in Sofia, Bulgaria as a limited liability company, represented by partners Margarit Jiponov, Svetla Jiponova and Mario Tsvetkov. The highly qualified design team of the company is made up of engineers &#8211; professionals in railway and road construction, engineers in transport facilities, engineer-geologists and hydrogeologists, geodesists, specialists in catenary, programmers. All engineers are members of the Chamber of Engineers in the Investment Design, Regional branch Sofia.<br \/>\nThe company also has the necessary equipment for geodetic measurements and design tasks &#8211; computers, software, total stations, GPS \/ GNSS receivers, levels, plotters, printers, scanners, cars. Margarit Jiponov has developed and owns copyright software for transport infrastructure design JCAD-VB 2018, as well as a design analysis program JCAD-VB FEM. Vector-Bul holds a certificate of quality ISO 9001:2015, licenses for the execution of design contracts with the National Railway Infrastructure Company and a certificate of competence from the Cadastre Agency.<\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-1 fusion_builder_column_1_2 1_2 fusion-one-half fusion-column-last\" style=\"--awb-bg-size:cover;--awb-margin-bottom:0px;width:50%;width:calc(50% - ( ( 4% ) * 0.5 ) );\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"accordian fusion-accordian\" style=\"--awb-border-size:1px;--awb-icon-size:15px;--awb-content-font-size:19px;--awb-icon-alignment:left;--awb-hover-color:#ededed;--awb-border-color:#ededed;--awb-background-color:#ffffff;--awb-divider-color:#e0dede;--awb-divider-hover-color:#e0dede;--awb-icon-color:#ffffff;--awb-title-color:#333333;--awb-content-color:#333333;--awb-icon-box-color:#282a2b;--awb-toggle-hover-accent-color:#4169e1;--awb-title-font-family:Garamond, serif;--awb-title-font-weight:400;--awb-title-font-style:normal;--awb-title-font-size:19px;--awb-title-letter-spacing:0px;--awb-title-line-height:1.43;--awb-content-font-family:Garamond, serif;--awb-content-font-style:normal;--awb-content-font-weight:400;\"><div class=\"panel-group fusion-toggle-icon-boxed\" id=\"accordion-12671-1\"><div class=\"fusion-panel panel-default panel-23f09219a61970e89 fusion-toggle-has-divider\" style=\"--awb-title-color:#333333;--awb-content-color:#333333;\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_23f09219a61970e89\"><a aria-expanded=\"false\" aria-controls=\"23f09219a61970e89\" role=\"button\" data-toggle=\"collapse\" data-target=\"#23f09219a61970e89\" href=\"#23f09219a61970e89\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">225 Successful projects<\/span><\/a><\/h4><\/div><div id=\"23f09219a61970e89\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_23f09219a61970e89\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>Over the years, the company has proven itself in the market with high quality of the final product and professionalism to the last detail.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-9abe7b7b5a7a8a704 fusion-toggle-has-divider\" style=\"--awb-title-color:#333333;--awb-content-color:#333333;\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_9abe7b7b5a7a8a704\"><a aria-expanded=\"false\" aria-controls=\"9abe7b7b5a7a8a704\" role=\"button\" data-toggle=\"collapse\" data-target=\"#9abe7b7b5a7a8a704\" href=\"#9abe7b7b5a7a8a704\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">24 Years of company experience<\/span><\/a><\/h4><\/div><div id=\"9abe7b7b5a7a8a704\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_9abe7b7b5a7a8a704\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>Experience, knowledge and training are valuable advisers for any profession.<\/p>\n<\/div><\/div><\/div><div class=\"fusion-panel panel-default panel-7cfd151b1d34a74c0 fusion-toggle-has-divider\" style=\"--awb-title-color:#333333;--awb-content-color:#333333;\"><div class=\"panel-heading\"><h4 class=\"panel-title toggle\" id=\"toggle_7cfd151b1d34a74c0\"><a aria-expanded=\"false\" aria-controls=\"7cfd151b1d34a74c0\" role=\"button\" data-toggle=\"collapse\" data-target=\"#7cfd151b1d34a74c0\" href=\"#7cfd151b1d34a74c0\"><span class=\"fusion-toggle-icon-wrapper\" aria-hidden=\"true\"><i class=\"fa-fusion-box active-icon awb-icon-minus\" aria-hidden=\"true\"><\/i><i class=\"fa-fusion-box inactive-icon awb-icon-plus\" aria-hidden=\"true\"><\/i><\/span><span class=\"fusion-toggle-heading\">77 Satisfied customers<\/span><\/a><\/h4><\/div><div id=\"7cfd151b1d34a74c0\" class=\"panel-collapse collapse \" aria-labelledby=\"toggle_7cfd151b1d34a74c0\"><div class=\"panel-body toggle-content fusion-clearfix\">\n<p>We provide our clients with individual solutions and approaches for each project.<\/p>\n<\/div><\/div><\/div><\/div><\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div><div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-2 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-margin-top:0px;--awb-margin-bottom:0px;--awb-background-color:#ededed;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-2 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last\" style=\"--awb-padding-top:40px;--awb-padding-bottom:40px;--awb-bg-size:cover;--awb-margin-bottom:0px;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-column-wrapper-legacy\"><div class=\"fusion-text fusion-text-2\"><p><strong>Significant projects and contracts awarded and executed by Vector-Bul Ltd.<\/strong><\/p>\n<ul>\n<li>Project: RECONSTRUCTION AND ELECTRICIZATION OF THE RAILWAY PLOVDIV-SVILENGRAD &#8211; TURKEY \/ GREECE BORDER AND OPTIMIZATION OF THE ROAD FOR SPEED 160 km\/h(200 km\/h).<br \/>\nEmployer: NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC), Bulgaria<br \/>\nContractor (Consultant): Vector-Bul Ltd. as part of the Orient Express consortium<br \/>\nDeadline for implementation: 2003 year<br \/>\nProject Status (Completed, Approved): Approved and organized construction tenders.<\/li>\n<li>Project: &#8220;KRUMOVO &#8211; PARVOMAI, km 164+575.00 &#8211; km 202+300.00&#8221; from the first railway line under the project &#8220;ELECTRICIZATION AND RECONSTRUCTION OF RAILWAY PLOVDIV &#8211; SVILENGRAD, CORRIDORS IV AND IX&#8221;.<br \/>\nEmployer: TERNA<br \/>\nContractor (Consultant): Vector-Bul Ltd. &#8211; subcontractor<br \/>\nDeadline for implementation: 2006 year \u2013 2010 year<br \/>\nProject Status (Completed, Approved): Approved, completed and completed construction with Act 16.<\/li>\n<li>Project: &#8220;ELECTRIFICATION AND RECONSTRUCTION OF RAILWAY PLOVDIV &#8211; SVILENGRAD, CORRIDORS IV AND IX&#8221; PARVOMAI &#8211; SVILENGRAD, km 202+300.00 &#8211; km 298+800.00 PHASE 2 in the section from 202+300 \u0434\u043e 231+560 from the first railway line.<br \/>\nEmployer: ASTALDI<br \/>\nContractor (Consultant): Vector-Bul Ltd. &#8211; subcontractor<br \/>\nDeadline for implementation: 2007 year \u2013 2011 year<br \/>\nProject status (completed, approved): Approved, completed and completed construction with Act 16.<\/li>\n<li>Project: RECONSTRUCTION AND ELECTRICIZATION OF THE RAILWAY PLOVDIV-SVILENGRAD &#8211; TURKEY \/ GREECE BORDER AND OPTIMIZATION OF THE TRACE FOR SPEED 160 km\/h(200km\/h).<br \/>\nEmployer: OHL ZS a.s.<br \/>\nContractor company (Consultant): VECTOR-BUL LTD<br \/>\nDeadline for implementation: 2009 year \u2013 2012 year<br \/>\nProject status (completed, approved): Approved, completed and completed construction with Act 16.<\/li>\n<li>Project: Development of preliminary and working design for &#8220;INTERMODAL TERMINAL &#8211; SOFIA&#8221;<br \/>\nEmployer: Ministry of Transport, Information Technology and Communications<br \/>\nContractor (Consultant): Participant in the consortium AECOM &#8211; Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2007 year \u2013 2012 year<br \/>\nProject Status (Completed, Approved): Approved, completed and completed coordination procedures with all operating companies.<\/li>\n<li>Project: \u201cTechnical Assistance for Rehabilitation of the Railway Infrastructure on Mezdra &#8211; Gorna Oryahovitsa Railway Stations in Bulgaria\u201d<br \/>\nEmployer: Ministry of Transport<br \/>\nContractor (Consultant): Participant in a consortium between three foreign and two Bulgarian companies &#8211; Vector-Bul Ltd., TRANS EL Engineering SP, SUDOP PRAHA a.s., GETINSA, SYSTRA.<br \/>\nDeadline for implementation: 2007 year \u2013 2011 year<br \/>\nProject status (completed, approved): Approved and completed.<\/li>\n<li>Project: Technical assistance for the modernization of the Radomir-Gyueshevo railway line.<br \/>\nEmployer: Ministry of Transport<br \/>\nContractor (Consultant): Mott-Vector-Gamma Consortium<br \/>\nDeadline for implementation: 2009 year &#8211; 2010 year<br \/>\nProject status (completed, approved): Approved and completed.<\/li>\n<li>Project: &#8220;Updating of preliminary design and preparation for construction of the Vidin-Medkovets railway section under the project &#8220;Design of construction of the Vidin-Sofia railway line: updating of the project and preparation of the Vidin-Medkovets railway section&#8221;, Lot 1: Updating and optimization of conceptual design for the railway sections Medkovets &#8211; Ruska Byala and Ruska Byala &#8211; Stolnik&#8221; with a total length of 147 km.<br \/>\nEmployer: NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC), Bulgaria<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 02.2015 &#8211; 01.2016<br \/>\nProject status (completed, approved): Approved and completed.<\/li>\n<li>Project: &#8220;Preliminary studies and preliminary design of a railway track and geodesy for the modernization of the Dragoman railway section &#8211; border with the Republic of Serbia&#8221;.<br \/>\nEmployer: NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC), Bulgaria<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2019 year<br \/>\nProject status (completed, approved): Approved, agreed, completed.<\/li>\n<li>Project: Preparation of preliminary and technical design of the site &#8220;Breakthrough at the Water Palace &#8211; a two-level transport junction for the intersection of &#8220;Tsar Boris III &#8211; United&#8221; Blvd. and &#8220;Maritza Yug&#8221; Blvd.<br \/>\nEmployer: Plovdiv Municipality<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 12.2012 \u2013 09.2013<br \/>\nProject status (completed, approved): Completed with building permit issued, construction completed with act 16 for both sub-projects.<\/li>\n<li>Project: Preparation of market valuation for the acquisition of real estate for construction of &#8220;Luda Yana&#8221; dam and &#8220;Neykovtsi&#8221; dam<br \/>\nEmployer: Ministry of Regional Development and Public Works<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2012 year<br \/>\nProject Status (Completed, Approved): Approved and completed with completed market appraisal procedures for affected properties.<\/li>\n<li>Project: Rehabilitation of Sofia Central Station<br \/>\nEmployer: NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC), Bulgaria<br \/>\nContractor (Consultant): &#8220;GBS &#8211; Sofia Central Station&#8221;; Vector-Bul Ltd. &#8211; part railway and part constructive<br \/>\nDeadline for implementation: 02.2014 &#8211; 06.2014<br \/>\nProject Status (completed, approved): Approved, completed and completed construction with the issued act 16.<\/li>\n<li>Project: &#8220;Rehabilitation of the Plovdiv-Burgas railway line, Phase 2&#8221;, position: &#8220;Rehabilitation of the railway section Skutare &#8211; Orizovo&#8221;, part &#8220;Facilities&#8221; 811 &#8211; Belozem-Orizovo section &#8211; from km 32+879 to km 43+030<br \/>\nEmployer: INFRASTRUCTURAL CONSTRUCTION AD<br \/>\nContractor (Consultant): Vector-Bul Ltd. &#8211; part facilities<br \/>\nDeadline for implementation: 2017<br \/>\nProject status (completed, approved): Completed, approved, completed construction.<\/li>\n<li>Project: Reconstruction and electrification of the Plovdiv &#8211; Svilengrad railway along corridors IV and IX<br \/>\nObject: Design, construction and commissioning of the Krumovo sub-area with railway connection to the Krumovo station and pipeline network in the area of the Krumovo station<br \/>\nEmployer: Start Engineering AD<br \/>\nContractor (Consultant): Vector-Bul Ltd. in the parts &#8220;Geodesy&#8221;, &#8220;Road&#8221; and &#8220;Railway&#8221;<br \/>\nDeadline for implementation: 02.2015 &#8211; 05.2015<br \/>\nProject Status (Completed, Approved): Approved, completed with ACT 16.<\/li>\n<li>Project: Replacing joints for a bridge of the Trakia highway at km 37+390 and hydraulic reinforcement of the bridge.<br \/>\nEmployer: HIGHWAYS EAD<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2018 year<br \/>\nProject status (completed, approved): Completed, approved, completed construction.<\/li>\n<li>Project: \u201cPreliminary investment project for construction of a coal wagon landing on the territory of Rousse District Heating Company\u201d.<br \/>\nEmployer: District Heating Company Ruse EAD<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2019 year<br \/>\nProject status (completed, approved): Approved, completed.<\/li>\n<li>Project: Conceptual design for congested Chumerna station and division of land.<br \/>\nEmployer: MIN INVEST LTD<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2018 year<br \/>\nProject status (completed, approved): Completed, approved, completed construction.<\/li>\n<li>Project: Disaster recovery after derailment at the even throat of Dupnitsa Station.<br \/>\nEmployer: Railway Consortium DZZD 2012-2016<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 10.2016<br \/>\nProject status (completed, approved): Completed, approved, completed construction.<\/li>\n<li>Project: &#8220;Mechanical renewal of the railway from km 74+584 to km 77+156 with a length of 2572 m in the Delyan-Dyakovo interchange along the 5th railway line&#8221;.<br \/>\nEmployer: Railway Consortium DZZD 2012-2016<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 09.2016<br \/>\nProject status (completed, approved): Completed, approved, completed construction<\/li>\n<li>Project: \u201cWork project for railway tracks in a future industrial branch of a company Persenk Invest Ltd. in Kurtovo Konare<br \/>\nEmployer: Persenk Invest Ltd. &#8211; Plovdiv<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 09.2015 &#8211; 11.2015<br \/>\nProject status (completed, approved): Completed, approved, completed construction<\/li>\n<li>Project: Rehabilitation of the railway from Zaharna Fabrika station to Gorna Banya station. Along the 5th railway line with a total length of 4.4 km.<br \/>\nEmployer: NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC), Bulgaria<br \/>\nCompany contractor (Consultant): Vector-Bul Ltd.; builder TSV Sofia<br \/>\nDeadline for implementation: 08.2014 &#8211; 12.2015<br \/>\nProject status (completed, approved): Completed with Act 16 issued.<\/li>\n<li>Project: &#8220;Execution of exploration &#8211; design works and construction (engineering) of the site &#8220;Maritza River Bridge at km 0+525 on road III-809 Lyubimets &#8211; Golyamata zvezda&#8221;<br \/>\nEmployer: Consortium ORS Infrastructure and AB Haskovo AD<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 10.2013 \u2013 01.2014<br \/>\nStatus of the project (completed, approved): Approved and completed preliminary, technical design and detailed design and completed construction with act 16.<\/li>\n<li>Project: &#8220;Execution of exploration &#8211; design works and construction (engineering) of the site &#8220;Republic Road III-401 &#8220;Izvorche &#8211; Lovech &#8211; Petko Slaveikov&#8221; &#8211; reinforced concrete bridge over the Osam River at km 26+840&#8243;<br \/>\nEmployer: ORS Infrastructure<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 08.2013 \u2013 10.2013<br \/>\nStatus of the project (completed, approved): Approved and completed work design and completed construction with act 16.<\/li>\n<li>Project: Second and Fourth Railway Emergency Repair Projects:<br \/>\nkm 331+522 Asenovo station &#8211; drainage system and dikes at km 339+800 to km 340+100 (Asenovo &#8211; Slavyanovo). Reinforcement of landslide.<br \/>\nKm 341+150 &#8211; drainage system and landslide reinforcement.<br \/>\nKm 359+300 &#8211; Svetlen village &#8211; drainage system, 3D model making and railway reconstruction bridge.<br \/>\nPopovo &#8211; Reconstruction of railway station bridge.<br \/>\nkm 141+500 &#8211; Debelets-Sokolovo: drainage system and landslide reinforcement.<br \/>\nkm 153+050 &#8211; Ganchovets village: drainage system.<br \/>\nkm 158+000 &#8211; Dryanovo station: drainage system and landslide reinforcement.<br \/>\nfrom km 162+000 to km 165+000: drainage system and landslide reinforcement.<br \/>\nkm 166+000 &#8211; Tsareva Livada station: drainage system.<br \/>\nEmployer: NATIONAL RAILWAY INFRASTRUCTURE COMPANY (NRIC), Bulgaria<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2006 year &#8211; 2007 year<br \/>\nProject Status (Completed, Approved): Approved<\/li>\n<li>Project: Preparation of a working project for loading and unloading tracks of an enterprise for production of \u201cYTONG\u201d in Dobrich city.<br \/>\nEmployer: YTONG<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2005 year &#8211; 2006 year<br \/>\nProject Status (Completed, Approved): Approved<\/li>\n<li>Project: \u201cRehabilitation of Highways on the Radnevo &#8211; Stara Zagora Direction\u201d Road-50 041 from km 3+000.00 to km 14+680.00; Road-57 008 from km 3+900.00 to km 9+258.13; Road-57 012 from km 0+000.00 to km 3+188.88; Street in the village of Znamenosets from km 0+000.00 to km 0+399.98; Road-57 014 from km 0+000.00 to km 1+981.54; Street in Radnevo from km 0+000.00 to km 0+556.03; Road-57 004 from km 0+000.00 to km 7+363.67;<br \/>\nEmployer: Municipality of Radnevo<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2004 year &#8211; 2005 year<br \/>\nProject status (completed, approved): Completed, completed construction<\/li>\n<li>Project: Extension of Sofia subway to II metro diameter &#8211; Substation No. 9<br \/>\nEmployer: TAISEI<br \/>\nContractor Company (Consultant): Vector-Bul Ltd. Subcontractor &#8211; part geodesy<br \/>\nDeadline for implementation: 2006 year<br \/>\nProject Status (Completed, Approved): Construction approved and completed.<\/li>\n<li>Project: SILISTRA &#8211; CALARASH FERRY TERMINAL &#8211; construction of a ferry nest.<br \/>\nEmployer: MINERAL IN EAD<br \/>\nContractor Company (Consultant): Vector-Bul Ltd. &#8211; part geodesy and part constructive<br \/>\nDeadline for implementation: 2005 year<br \/>\nProject Status (Completed, Approved): Construction approved and completed.<\/li>\n<li>Project: \u201eINDUSTRIAL RAILWAY BRANCH OF KAOLIN AD &#8211;<br \/>\nS. KRUM &#8211; DIMITROVGRAD\u201d.<br \/>\nEmployer: Kaolin AD<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2006 year<br \/>\nStatus of the project (completed, approved): Approved, completed, agreed with the completed construction.<\/li>\n<li>Project: Railway ramp track in the cement plant &#8211; Zlatna Panega.<br \/>\nEmployer: Transstroy 99 Ltd.<br \/>\nContractor (Consultant): Vector-Bul Ltd.<br \/>\nDeadline for implementation: 2006 year<br \/>\nProject status (completed, approved): Approved, completed and completed construction.<\/li>\n<\/ul>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div><\/p>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"100-width.php","meta":{"footnotes":""},"class_list":["post-12671","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>ABOUT US &#8226; Design of railway infrastructure \u2022 Vector-Bul<\/title>\n<meta name=\"description\" content=\"Vector-Bul Ltd. was established in 2002 headquartered in Sofia, Bulgaria as a limited liability company.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.vector-bul.com\/en\/about-us\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"ABOUT US &#8226; Design of railway infrastructure \u2022 Vector-Bul\" \/>\n<meta property=\"og:description\" content=\"Vector-Bul Ltd. was established in 2002 headquartered in Sofia, Bulgaria as a limited liability company.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.vector-bul.com\/en\/about-us\/\" \/>\n<meta property=\"og:site_name\" content=\"Design of railway infrastructure \u2022 Vector-Bul\" \/>\n<meta property=\"article:modified_time\" content=\"2026-03-02T08:22:54+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/about-us\\\/\",\"url\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/about-us\\\/\",\"name\":\"ABOUT US &#8226; Design of railway infrastructure \u2022 Vector-Bul\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/#website\"},\"datePublished\":\"2019-10-13T21:00:16+00:00\",\"dateModified\":\"2026-03-02T08:22:54+00:00\",\"description\":\"Vector-Bul Ltd. was established in 2002 headquartered in Sofia, Bulgaria as a limited liability company.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/about-us\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/about-us\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/about-us\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"\u041d\u0430\u0447\u0430\u043b\u043e\",\"item\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"ABOUT US\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/\",\"name\":\"Design of railway infrastructure \u2022 Vector-Bul\",\"description\":\"Design of railway infrastructure, roads and highways, bridges, tunnels, intermodal terminals, consultations, geodesy, cadastre, objects of transport infrastructure. Investment design.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/#organization\",\"name\":\"\\\"\u0412\u0435\u043a\u0442\u043e\u0440-\u0411\u0443\u043b\\\" \u041e\u041e\u0414\",\"url\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.vector-bul.com\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/VB-logo-72x72.png\",\"contentUrl\":\"https:\\\/\\\/www.vector-bul.com\\\/wp-content\\\/uploads\\\/2019\\\/10\\\/VB-logo-72x72.png\",\"width\":72,\"height\":72,\"caption\":\"\\\"\u0412\u0435\u043a\u0442\u043e\u0440-\u0411\u0443\u043b\\\" \u041e\u041e\u0414\"},\"image\":{\"@id\":\"https:\\\/\\\/www.vector-bul.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"ABOUT US &#8226; Design of railway infrastructure \u2022 Vector-Bul","description":"Vector-Bul Ltd. was established in 2002 headquartered in Sofia, Bulgaria as a limited liability company.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.vector-bul.com\/en\/about-us\/","og_locale":"en_US","og_type":"article","og_title":"ABOUT US &#8226; Design of railway infrastructure \u2022 Vector-Bul","og_description":"Vector-Bul Ltd. was established in 2002 headquartered in Sofia, Bulgaria as a limited liability company.","og_url":"https:\/\/www.vector-bul.com\/en\/about-us\/","og_site_name":"Design of railway infrastructure \u2022 Vector-Bul","article_modified_time":"2026-03-02T08:22:54+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.vector-bul.com\/en\/about-us\/","url":"https:\/\/www.vector-bul.com\/en\/about-us\/","name":"ABOUT US &#8226; Design of railway infrastructure \u2022 Vector-Bul","isPartOf":{"@id":"https:\/\/www.vector-bul.com\/en\/#website"},"datePublished":"2019-10-13T21:00:16+00:00","dateModified":"2026-03-02T08:22:54+00:00","description":"Vector-Bul Ltd. was established in 2002 headquartered in Sofia, Bulgaria as a limited liability company.","breadcrumb":{"@id":"https:\/\/www.vector-bul.com\/en\/about-us\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.vector-bul.com\/en\/about-us\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.vector-bul.com\/en\/about-us\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"\u041d\u0430\u0447\u0430\u043b\u043e","item":"https:\/\/www.vector-bul.com\/en\/"},{"@type":"ListItem","position":2,"name":"ABOUT US"}]},{"@type":"WebSite","@id":"https:\/\/www.vector-bul.com\/en\/#website","url":"https:\/\/www.vector-bul.com\/en\/","name":"Design of railway infrastructure \u2022 Vector-Bul","description":"Design of railway infrastructure, roads and highways, bridges, tunnels, intermodal terminals, consultations, geodesy, cadastre, objects of transport infrastructure. Investment design.","publisher":{"@id":"https:\/\/www.vector-bul.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.vector-bul.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.vector-bul.com\/en\/#organization","name":"\"\u0412\u0435\u043a\u0442\u043e\u0440-\u0411\u0443\u043b\" \u041e\u041e\u0414","url":"https:\/\/www.vector-bul.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.vector-bul.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.vector-bul.com\/wp-content\/uploads\/2019\/10\/VB-logo-72x72.png","contentUrl":"https:\/\/www.vector-bul.com\/wp-content\/uploads\/2019\/10\/VB-logo-72x72.png","width":72,"height":72,"caption":"\"\u0412\u0435\u043a\u0442\u043e\u0440-\u0411\u0443\u043b\" \u041e\u041e\u0414"},"image":{"@id":"https:\/\/www.vector-bul.com\/en\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.vector-bul.com\/en\/wp-json\/wp\/v2\/pages\/12671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.vector-bul.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.vector-bul.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.vector-bul.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.vector-bul.com\/en\/wp-json\/wp\/v2\/comments?post=12671"}],"version-history":[{"count":0,"href":"https:\/\/www.vector-bul.com\/en\/wp-json\/wp\/v2\/pages\/12671\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.vector-bul.com\/en\/wp-json\/wp\/v2\/media?parent=12671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}