Project: “Breakage of the Water Palace - Two-level transport junction for the connection of Tsar Boris III Obedinitel Blvd. and Maritza Blvd - south and capital repair of Ruski Blvd. (Central station near 6th September Blvd.) Design phase: Preliminary and technical design Contracting Authority: Plovdiv Municipality Contractor (Consultant): Vector-Bul