Project: "Electrification and reconstruction of the Plovdiv - Svilengrad railway line, corridors IV and IX" Parvomai - Svilengrad, km 202+300.00 - km 298+800.00 phase 2 in the section 202+300 to 231+560 from the first railway line Design phase: Definitive design Employer: ASTALDI Contractor company (Consultant): Vector-Bul Ltd. - subcontractor Excerpt
Reconstruction and electrification of the Plovdiv – Svilengrad – Turkish border / Greek border railway line and optimization of the 160 km/h (200 km/h) route – 2009.
Project: Reconstruction and electrification of the Plovdiv - Svilengrad - Turkish border / Greek border railway line and optimization of the 160 km/h (200 km/h) route. Design phase: Definitive design Employer: OHL ZS a.s. Contractor company (Consultant): Vector-Bul Ltd. Excerpt from the reference: Vector-Bul Ltd. has a team of qualified